Complete FedRAMP Advisory – Validate
- Have implemented all controls and processes, especially the critical controls
- Have prepared a complete set of all required documentation
- Would like external validation before starting a 3PAO assessment
- Perform a final validation of FedRAMP documentation and controls to identify and fix problems before the official 3PAO assessment begins
- List of documentation gaps, control gaps and recommendations for priority remediations prior to assessment
- Perform a “dry run” review and validation of the FedRAMP documentation and controls
- Perform QA validation of the final FedRAMP package
- Perform “dry run” assessment to verify that artifacts are available and that controls are operating as intended
- Identify documentation, artifact, control design, and control operation deficiencies
- Determine “quick fixes” for gaps that can be remediated before the 3PAO assessment
- Update POA&Ms as needed for identified gaps